OAKLAND RESIDENCE: DRY ROT REPAIR
 
 

 

 

 

The entry stairs of this Oakland residence had become unsafe over the years due to unseen rot beneath the treads and risers.

After the removal and disposal of the existing stairs (treads, risers and stringers), three new pressure treated 2"x12" stringers were cut and installed. All cut edges on the stringers were resealed with pressure treated wood sealer prior to installation. We then installed new pre-primed redwood skirt boards, ten new pre-primed redwood risers using PL400 adhesive at stringers, and silicone caulk at skirt boards, and ten new pre-primed Alaskan yellow cedar treads using PL400 adhesive at stringers, and silicone caulk at skirt boards and risers. All redwood and cedar end grain is sealed with marine grade epoxy prior to painting. All components are fastened with exterior grade deck screws and/or stainless steel nails.

As with all projects undertaken by Period Restoration, the quality of the construction methods and materials used ensure that the final product will serve the client for many years to come.

 

 

slide 1

 

 

slide 2

 

slide 3

 

slide 4

 

 
PERIOD RESTORATION, INC. | General Contractors & Cabinet Makers | License # 769042 | Telephone/Fax: 510.601.1807